Civicslog

Tracking presidential actions and other news.

Action Area: energy

Page 1 of 2

Declaring a National Emergency to Secure the United States Bulk-Power System

Date: 2026-08-26

Source: whitehouse.gov

Type: presidential-action

Action areas: energy foreign-policy

AI-generated

The order directs federal agencies to address a declared national emergency involving potential foreign threats to the United States bulk-power system, including risks from compromised equipment, cyber access, and supply-chain disruptions. It invokes the International Emergency Economic Powers Act and the National Emergencies Act to support additional controls over foreign-produced electric equipment used in the system.

Removing Unnecessary and Counterproductive Restrictions on Access to Federal Lands

Date: 2026-05-29

Source: whitehouse.gov

Type: presidential-action

Action areas: federal-lands federal-regulations energy

AI-generated

The order directs federal agencies to rescind and replace the off‑road vehicle designation criteria from Executive Orders 11644 and 11989 and instead manage off‑road vehicle use on Federal lands under existing statutory authorities such as the National Historic Preservation Act, NEPA, the Endangered Species Act, and the Federal Land Policy and Management Act. It instructs agencies to adopt an updated framework reflecting technological and land‑management developments to reduce vague, subjective criteria that have impeded energy, timber, utility maintenance, permitting, and access.

Presidential Permit: Authorizing Bridger Pipeline Expansion LLC to Construct, Connect, Operate, and Maintain Pipeline Facilities at the International Boundary at Phillips County, Montana, Between the United States and Canada

Date: 2026-04-30

Source: whitehouse.gov

Type: presidential-action

Action areas: energy infrastructure international-trade

AI-generated

The order directs federal agencies to grant Bridger Pipeline Expansion LLC a Presidential permit to construct, connect, operate, and maintain 36-inch pipeline border facilities at the international boundary in Phillips County, Montana, for transporting crude oil and petroleum products (including naphtha, LPG, natural gas liquids, jet fuel, gasoline, kerosene, and diesel) between the United States and Canada, excluding natural gas subject to the Natural Gas Act. The permit limits the U.S. “Border facilities” to the pipeline segment from the border to the first mainline shut-off valve or pumping station within 2,000 feet, subjects operations to applicable federal laws and permit conditions

Presidential Determination Pursuant to Section 303 of the Defense Production Act of 1950, as Amended, on Coal Supply Chains and Baseload Power Generation Capacity

Date: 2026-04-20

Source: whitehouse.gov

Type: presidential-action

Action areas: defense energy

AI-generated

The order directs federal agencies to expand coal supply chains and baseload power generation capacity by treating coal mining, rail and barge logistics, terminals, generating unit availability and life‑extension work, on‑site stockpiles, and related reliability upgrades as industrial resources essential to national defense. The memorandum instructs the Secretary of Energy to use authorities under section 303 of the Defense Production Act to pursue purchases, purchase commitments, financial support, or other actions to increase production and availability because industry cannot meet needs in a timely manner due to financing, regulatory, maintenance, and market barriers.

Presidential Determination Pursuant to Section 303 of the Defense Production Act of 1950, as Amended, on Domestic Petroleum Production, Refining, and Logistics Capacity

Date: 2026-04-20

Source: whitehouse.gov

Type: presidential-action

Action areas: defense energy federal-regulations

AI-generated

The order directs federal agencies to implement a Presidential Determination under section 303 of the Defense Production Act finding domestic petroleum production, refining, and logistics capacity—including exploration and production, pipelines, storage, and marine terminals—are essential to national defense and to take actions to expand those capacities. It authorizes purchases, purchase commitments, financial support for developing production capabilities, and other measures to address financing, long lead times, permitting, and supply-chain constraints and waives certain statutory requirements under section 303 to enable expedited Federal support.

Presidential Determination Pursuant to Section 303 of the Defense Production Act of 1950, as Amended, on Grid Infrastructure, Equipment, and Supply Chain Capacity

Date: 2026-04-20

Source: whitehouse.gov

Type: presidential-action

Action areas: defense energy infrastructure

AI-generated

The order directs federal agencies to treat grid infrastructure and associated supply chains—such as transformers, transmission lines and conductors, substations, high‑voltage circuit breakers, power control electronics, protective relay systems, capacitor banks, electrical core steel, related raw materials, and manufacturing tools—as industrial resources essential to national defense under section 303 of the Defense Production Act. It instructs the Secretary of Energy and other appropriate agencies to use authorities under that Act to support purchases, purchase commitments, and financial assistance to expand domestic production capacity and shorten procurement timelines because current domestic capacity is limited, production lead times are long, and reliance on imports creates vulnerabilities.

Presidential Determination Pursuant to Section 303 of the Defense Production Act of 1950, as Amended, on Natural Gas Transmission, Processing, Storage, and Liquefied Natural Gas Capacity

Date: 2026-04-20

Source: whitehouse.gov

Type: presidential-action

Action areas: defense energy federal-regulations

AI-generated

The order directs federal agencies to treat natural gas and liquefied natural gas (LNG) infrastructure—including gathering and transmission pipelines, compression, processing plants, underground storage, LNG liquefaction, storage and marine load, export facilities, and critical distribution infrastructure—as industrial resources essential to national defense and to use authorities under section 303 of the Defense Production Act to expand those capacities. The memorandum instructs the Secretary of Energy and other relevant agencies to pursue purchases, purchase commitments, financial support, and other actions to overcome financing, long-lead equipment, permitting, and infrastructure bottlenecks so domestic industry can timely provide increased transmission, processing, storage, and export

Presidential Permit: Authorizing Bakken Pipeline Company LP to Construct, Connect, Operate, and Maintain Pipeline Facilities at Burke County, North Dakota, at the International Boundary Between the United States and Canada

Date: 2026-04-15

Source: whitehouse.gov

Type: presidential-action

Action areas: energy infrastructure international-trade

AI-generated

The order directs federal agencies to grant Bakken Pipeline Company LP a Presidential permit to construct, connect, operate, and maintain a 24-inch diameter pipeline Border facility at the international boundary near Portal, North Dakota, extending to the first mainline shut-off valve or pumping station within one mile of the border for transport of crude oil and petroleum products (excluding natural gas covered by the Natural Gas Act). The permit subjects the Border facilities to all applicable U.S. laws and regulations, requires Presidential approval for substantial changes to location or operation (while allowing adjustments to average daily throughput and flow direction), and imposes specified conditions and compliance requirements on the permittee.

Presidential Permit: Authorizing Bakken Pipeline Company LP to Operate and Maintain Existing Pipeline Facilities at Burke County, North Dakota, at the International Boundary Between the United States and Canada

Date: 2026-04-15

Source: whitehouse.gov

Type: presidential-action

Action areas: energy international-trade infrastructure

AI-generated

The order directs federal agencies to grant Bakken Pipeline Company LP a Presidential permit to operate and maintain existing 12‑inch diameter pipeline border facilities near Portal, Burke County, North Dakota, allowing transport of crude oil and petroleum products (including naphtha, LPG, natural gas liquids, jet fuel, gasoline, kerosene, and diesel) between the United States and Canada while excluding natural gas under the Natural Gas Act. It revokes the prior April 8, 1996 permit, subjects the border facilities and their operation to applicable U.S. laws and regulations, and requires presidential approval for any substantial changes to the facilities or their authorized operation.

Presidential Permit: Authorizing Enbridge Energy Company, INC. to Operate and Maintain Existing Pipeline Facilities at St. Clair County, Michigan, at the International Boundary Between the United States and Canada

Date: 2026-04-15

Source: whitehouse.gov

Type: presidential-action

Action areas: energy international-trade federal-regulations

AI-generated

The order directs federal agencies to grant Enbridge Energy Company, Inc. a Presidential permit authorizing operation and maintenance of existing 30‑inch diameter pipeline Border facilities in St. Clair County, Michigan, at the U.S.–Canada boundary for transport of crude oil and petroleum products (including naphtha, LPG, natural gas liquids, jet fuel, gasoline, kerosene, and diesel) but not natural gas under the Natural Gas Act, and to subject those Border facilities to all applicable U.S. laws and regulations while superseding a prior April 28, 1953 permit. The permit limits the Border facilities to the U.S. portion extending to the

Presidential Permit: Authorizing Enbridge Energy, Limited Partnership to Operate and Maintain Existing Pipeline Facilities at Pembina County, North Dakota, at the International Boundary Between the United States and Canada

Date: 2026-04-15

Source: whitehouse.gov

Type: presidential-action

Action areas: energy international-trade federal-regulations

AI-generated

The order directs federal agencies to grant a Presidential permit allowing Enbridge Energy, Limited Partnership to operate and maintain existing pipeline border facilities at the U.S.–Canada boundary near Neche, Pembina County, North Dakota, for transport of crude oil and petroleum products (excluding natural gas subject to the Natural Gas Act), covering a 36-inch diameter pipeline from the international border to the first mainline shut-off valve or pumping station about 3 miles inside the United States and superseding the prior 2017 permit. The permit requires the Border facilities to remain subject to all applicable laws and regulations, prohibits substantial changes to the facilities or their operation without presidential approval, and is

Presidential Permit: Authorizing Enbridge Energy, Limited Partnership to Operate and Maintain Existing Pipeline Facilities at St. Clair County, Michigan, at the International Boundary Between the United States and Canada

Date: 2026-04-15

Source: whitehouse.gov

Type: presidential-action

Action areas: energy international-trade federal-regulations

AI-generated

The order directs federal agencies to grant Enbridge Energy, Limited Partnership a Presidential permit to operate and maintain specified existing pipeline border facilities in St. Clair County, Michigan, authorizing transport of crude oil and petroleum products (but not natural gas subject to the Natural Gas Act) across the international boundary and superseding the prior December 12, 1991 permit. The permit defines the Facilities and Border facilities (a 30-inch pipeline extending to the first mainline shut-off valve or pumping station ~0.3 miles inside the U.S.), makes the facilities subject to all applicable laws and regulations, and requires Presidential approval for any substantial changes to location, facilities, or

Presidential Permit: Authorizing Enbridge Energy, Limited Partnership to Operate and Maintain Three Existing Pipeline Facilities at Pembina County, North Dakota, at the International Boundary Between the United States and Canada

Date: 2026-04-15

Source: whitehouse.gov

Type: presidential-action

Action areas: energy international-trade

AI-generated

The order directs federal agencies to grant a Presidential permit to Enbridge Energy, Limited Partnership, authorizing it to operate and maintain three existing international pipeline Border facilities in Pembina County, North Dakota, for transporting crude oil and petroleum products (including naphtha, liquefied petroleum gas, natural gas liquids, jet fuel, gasoline, kerosene, and diesel) but excluding natural gas subject to the Natural Gas Act, and it supersedes and revokes the December 12, 1991 permit. The permit specifies the Border facilities as 26-inch, 34-inch, and 18-inch diameter pipelines extending roughly 25, 0.75,

Presidential Permit: Authorizing Enbridge Pipelines (Southern Lights) L.L.C. to Operate and Maintain Existing Pipeline Facilities at Pembina County, North Dakota, at the International Boundary Between the United States and Canada

Date: 2026-04-15

Source: whitehouse.gov

Type: presidential-action

Action areas: energy international-trade infrastructure

AI-generated

The order directs federal agencies to grant Enbridge Pipelines (Southern Lights) L.L.C. a Presidential permit to operate and maintain existing pipeline Border facilities at Neche, Pembina County, North Dakota, allowing transport of crude oil and all petroleum products (including naphtha, LPG, natural gas liquids, jet fuel, gasoline, kerosene, and diesel) across the U.S.–Canada border, but excluding natural gas subject to the Natural Gas Act. The permit supersedes the June 10, 2008 permit, defines the Border facilities as a 20-inch pipeline extending approximately 3 miles into the United States to the first mainline shut-off

Adjusting Certain Delegations Under the Defense Production Act

Date: 2026-03-13

Source: whitehouse.gov

Type: presidential-action

Action areas: defense federal-regulations energy

AI-generated

The order directs federal agencies to amend prior delegations under the Defense Production Act by allowing the Secretary of Energy to exercise, independently of the Secretary of Commerce, any authority delegated under section 203 of Executive Order 13603, and clarifies that agency heads need only recommend action to the President under section 2(a) of Executive Order 14156 when the authority is vested solely in the President and has not been delegated. It specifies that these changes do not alter legal authorities of agencies or the Director of OMB, must be implemented consistent with law and available appropriations, and that the Department of Energy will bear the publication costs.

Ratepayer Protection Pledge Proclamation

Date: 2026-03-04

Source: whitehouse.gov

Type: presidential-action

Action areas: ai energy federal-regulations

AI-generated

This proclamation proclaims March 4, 2026 as the date on which seven leading U.S. hyperscalers and AI companies formally accepted the “Ratepayer Protection Pledge.” It states that those companies will ensure their data-center electricity needs do not raise household electricity costs by building, bringing, or buying new generation resources, paying for all new power-delivery infrastructure upgrades, negotiating and paying separate rates with utilities and state governments, and coordinating with grid operators while investing in local communities.

Strengthening United States National Defense with America’s Beautiful Clean Coal Power Generation Fleet

Date: 2026-02-11

Source: whitehouse.gov

Type: presidential-action

Action areas: defense energy federal-regulations

AI-generated

The order directs the Department of War (DOW), in coordination with the Department of Energy, to prioritize the preservation and strategic use of coal-based energy assets. This includes procuring power from the United States coal generation fleet through long-term Power Purchase Agreements or similar contracts with coal-fired energy production facilities. The primary focus is on projects that enhance grid reliability, on-site fuel security, and mission assurance for defense and intelligence capabilities.

Regulatory Relief for Certain Stationary Sources to Promote American Coke Oven Processing Security

Date: 2025-11-21

Source: whitehouse.gov

Type: presidential-action

Action areas: federal-regulations energy defense

AI-generated

The order directs the Environmental Protection Agency to exempt certain stationary sources from compliance with sections of the Coke Oven Rule for an additional two years beyond the current compliance dates. The Coke Oven Rule, which imposes new emissions-control requirements on coke oven facilities, has been cited as placing severe burdens on the coke production industry, with the technology required for compliance not yet existing in a commercially viable form. The exemption is intended to prevent possible harm to the domestic coke production industry and the potential impact on national security and infrastructure.

Regulatory Relief for Certain Stationary Sources to Promote American Mineral Security

Date: 2025-10-24

Source: whitehouse.gov

Type: presidential-action

Action areas: federal-regulations energy defense

AI-generated

The order directs federal agencies to exempt certain stationary sources, specifically domestic copper smelters, from compliance with the Copper Rule for an additional 2 years beyond the original compliance dates. The Copper Rule, implemented by the Environmental Protection Agency, imposes new emissions-control requirements on primary copper smelters. The exemption is based on the determination that the technology to implement the Copper Rule is not commercially viable and that maintaining domestic copper smelting capacity is vital to the country's national security and economic strength.

National Energy Dominance Month, 2025

Date: 2025-10-17

Source: whitehouse.gov

Type: presidential-action

Action areas: energy natural-resources

AI-generated

The order directs federal agencies to prioritize energy production and deregulation. It establishes the National Energy Dominance Council to maintain the American energy industry's global leadership. It also lifts regulations on coal plants, initiates a nuclear energy renaissance, and opens up the Arctic National Wildlife Refuge in Alaska for drilling. The order aims to restore the United States as a global energy superpower.

Regulatory Relief for Certain Stationary Sources to Further Promote American Energy

Date: 2025-07-17

Source: whitehouse.gov

Type: presidential-action

Action areas: energy federal-regulations

AI-generated

The order directs the Environmental Protection Agency to exempt certain stationary sources, such as coal-fired power plants, from compliance with stricter emissions standards set by a rule published on May 7, 2024. The exemption, which extends the compliance deadline by two years from July 8, 2027 to July 8, 2029, is based on the determination that the technology to meet the new standards is not commercially viable. The order also asserts that maintaining the current standards is in the national security interests of the United States.

Ending Market Distorting Subsidies for Unreliable, Foreign‑Controlled Energy Sources

Date: 2025-07-07

Source: whitehouse.gov

Type: presidential-action

Action areas: energy federal-regulations taxes

AI-generated

The order directs federal agencies to eliminate subsidies for energy sources like wind and solar, arguing they distort the market and are unreliable. The Department of the Treasury is instructed to enforce the termination of clean electricity production and investment tax credits for these facilities, as well as implement enhanced Foreign Entity of Concern restrictions. The Department of the Interior is directed to review and revise regulations that provide preferential treatment to wind and solar facilities compared to other energy sources.

Presidential Permit: Authorizing Junction Pipeline Company, LLC to Construct, Connect, Operate, and Maintain Pipeline Facilities at Toole County, Montana, at the International Boundary Between the United States and Canada

Date: 2025-06-30

Source: whitehouse.gov

Type: presidential-action

Action areas: energy infrastructure international-trade

AI-generated

The order directs Junction Pipeline Company, LLC to construct, connect, operate, and maintain pipeline facilities at Toole County, Montana, at the international boundary between the United States and Canada. This permit allows for the import from Canada into the United States of various crude oil and petroleum products, but not natural gas. The facilities are subject to all relevant laws and regulations, including pipeline safety laws and regulations issued or administered by the Pipeline and Hazardous Materials Safety Administration of the U.S. Department of Transportation. The permit also includes conditions related to potential changes, inspections, and removal of the facilities.

Presidential Permit Authorizing South Bow (USA) LP to Operate and Maintain Pipeline Facilities at Cavalier County, North Dakota, at the International Boundary Between the United States and Canada

Date: 2025-06-30

Source: whitehouse.gov

Type: presidential-action

Action areas: energy infrastructure international-trade

AI-generated

The order directs United States forces to conduct a precision strike against three nuclear facilities in Iran, which are reportedly used for nuclear weapons development. The strike was conducted in a way to minimize casualties and deter future attacks, without the use of US ground forces. The action was taken under the President's constitutional authority as Commander in Chief and Chief Executive, and the United States may take further action if necessary to address threats or attacks. [Editor's Note: There's been a mixup on the White House website. The source link formerly led to the text of the letter the president sent to Congress justifying his decision to attack Iran's nuclear bomb making facilities See here. That is what has been summarized here. Meanwhile, the post for the letter is absent from the White House website. And weirdly, the copy at the letter URL describes the Presidential Permit described in the headline.]

Presidential Permit Authorizing Steel Reef US Pipelines LLC To Operate and Maintain Pipeline Facilities at Burke County, North Dakota, at the International Boundary Between the United States and Canada

Date: 2025-06-30

Source: whitehouse.gov

Type: presidential-action

Action areas: infrastructure international-trade energy

AI-generated

The order directs Steel Reef US Pipelines LLC to operate and maintain existing pipeline facilities at the international boundary between the United States and Canada in Burke County, North Dakota. This permit allows for the export of natural gas liquids from the U.S. into Canada, excluding natural gas under section 3 of the Natural Gas Act. The facilities include an 8.625-inch diameter pipeline and associated structures and equipment. The order also stipulates that the operation and maintenance of these facilities are subject to all applicable laws and regulations, including pipeline safety laws administered by the Pipeline and Hazardous Materials Safety Administration.

Simplifying the Funding of Energy Infrastructure and Critical Mineral and Material Projects

Date: 2025-06-30

Source: whitehouse.gov

Type: presidential-action

Action areas: energy federal-regulations infrastructure

AI-generated

The order directs federal agencies to streamline the funding process for energy infrastructure and critical mineral and material projects. This includes sharing information on funding applications and commitments among agencies, particularly with the Chair of the National Energy Dominance Council. The directive also mandates the development of a common application for federal funding opportunities related to these projects within 180 days, allowing applicants to apply simultaneously to multiple federal programs. The goal is to facilitate faster, more strategic investment decisions and reduce duplicative processes.

Stopping Radical Environmentalism to Generate Power for the Columbia River Basin

Date: 2025-06-12

Source: whitehouse.gov

Type: presidential-action

Action areas: environment energy federal-regulations

AI-generated

The order directs the Secretary of Energy, the Secretary of the Interior, the Secretary of Commerce, and the Assistant Secretary of the Army for Civil Works to revoke a previous memorandum from 2023, which proposed breaching four dams on the Lower Snake River, eliminating over 3,000 megawatts of hydroelectric generating capacity. The current order also instructs these department heads to withdraw from a related Memorandum of Understanding and rescind a Notice of Intent to prepare a Supplemental Environmental Impact Statement for the Columbia River System Operations. The heads of departments are further directed to develop a new schedule for completing this Environmental Impact Statement.

Trump II Administration Opens Alaska wilderness to Drilling and Mining

Date: 2025-06-03

Source: nytimes.com

Type: news

Action areas: environment energy climate

Human-written

The Trump administration announced it would end federal protections for millions of acres of Alaska wilderness, opening it up to oil drilling and mining. Interior Secretary Doug Burgum said president Biden had exceeded his authority when his administration banned mining and drilling in the area last year. The site is known as the National Petroleum Reserve-Alaska and was created during the early 1900s to provide a petroleum reserve for the Navy.

Deploying Advanced Nuclear Reactor Technologies for National Security

Date: 2025-05-23

Source: whitehouse.gov

Type: presidential-action

Action areas: defense energy ai

AI-generated

The order directs federal agencies to accelerate the development and deployment of advanced nuclear reactor technologies for national security purposes. It instructs the Department of Defense (DoD), specifically the Secretary of the Army, to establish a program for the use of nuclear energy and to begin operation of a nuclear reactor at a domestic military base by September 30, 2028. The Department of Energy (DoE) is directed to provide technical advice on the design, construction, and operation of these reactors, and to initiate the process for designating AI data centers as critical defense facilities. The order also aims to enhance the export of U.S. nuclear technology to allies and commercial partners.